EPR-FLAMANVILLE.

EPR Flamanville - Maintenance on 300T and 20T bridges

Study and manufacturing of the large capacity main bridge and the auxiliary bridge.

2014-edf-epr-flamanville-vue-des-ponts-apres-travaux_originale.jpg

MAIN AND AUXILIARY DECK IN THE ENGINE ROOM

Study and manufacturing of the large capacity main bridge and the auxiliary bridge. The supply of the bridges includes: the trolleys, the bridge running rails, the trolley running tracks, the power supply as well as the control system.

- Bridges classified “High security – level 2”.
- Capacity: 300T/70T ® 20T
- Range: 51.06 m® 49.20 m
- Execution: 2007 - 2009

Project owner: EDF

As part of the construction of the 3rd generation EPR nuclear power plant in Flamanville, we also produced several lifting equipment used for the assembly and maintenance of the plant's equipment.

12 heavy bridges

12 overhead cranes from 25 to 100 tonnes and one 300 tonne bridge

80 various machines

Creations of wall-mounted jib cranes, on barrels, suspended bridges, lifting tables, etc.

1500 hoists

Supply of 1500 hoists from 500 Kg to 1 Ton