MANUFACTURING
Manufacturing completed for the two central parts of the future Interbassin crane for the @ESID of Toulon. This part called “Turret” is the link between the lifting and lifting mechanisms and the super structures of the crane (boom, winch room, translation, etc.).
TRANSPORTATION
The parts are transported by truck for machining until the next step: welding and painting of both parts.
PAINT
The complete painting of the turret will be carried out in a specific airlock to take into account its exceptional dimensions !