CEA Cadarache - Projet STEP Pont roulant 45T

Cadarache site - High security 45T bridge

Located on the CEA Cadarache site.

BRIDGE FEATURES

The STAR building (Treatment, Sanitation and Reconditioning Station) of INB 55 is located on the CEA Cadarache site.
Our services concern the carrying out of execution studies and construction plans, the supply, assembly, inspections and tests by an approved body, on-site tests of a twin-girder handling bridge and its specific associated equipment. , notably 63kN Hoists
& 30kN auxiliaries.
This contract provides for a period of preventive maintenance during the 2 year warranty period.

  • STAR installation of CEA Cadarache.
  • Double-girder box overhead crane
  • CMU: 45 Tons
  • Drum safety brake
Key figures Handling capacity: 45T | Range: approximately 13,900 m | Main hook height: 7,200 m

Similar achievements