COMETE-J.PARISAs part of the delivery of the new 103P crane by COMETE-J.PARIS, with a view to maintaining control of the schedule and pooling resources for the installation of the new crane, our services consist of the removal of the Caillard 06P crane dating from 1982, its evacuation and dismantling prior to the installation of the new crane.
| |
ProcessThis operation requires the carrying out of studies beforehand: study of the stability of the 06 P crane during the transfer, study of the stability of the crane during the dismantling of the 06P, the definition of tools for the transfer by barge, the definition of means and a loading/unloading procedure.
|
Dismantling Crane 06P
EVACUATION AND DISMANTLING OF THE CAILLARD 06P CRANE