135 T SAFETY BRIDGEICEDA is an INB (Basic Nuclear Installation) constituting the interface between the waste production sites and the final outlet for storage of the various activated waste.
| |
The 135T high security level 2 overhead crane allows the castles to be tilted from their transport position (lying) to their handling position (vertical). This tilting is carried out parallel to the steering movement. It allows the handling of TN12 and TN13 type transport packaging in the reception hall of the ICEDA installation on the EDF Bugey site. |
Iceda - Supply of two overhead cranes
EDF - ICEDA Temporary storage facility.
Key figures
Handling capacity: 135T and 36T | Range: 15m | Translation travel: 43m