Site-Prega

Prega site - 2x10T electric gantry

New replacement of the POTAIN gantry.

This project consists of replacing the existing POTAIN gantry dating from 1988, with a capacity of 2x8t, as it is becoming obsolete. This gantry is used to handle daily production for storage and to load trucks to deliver to sites over a period of 10 hours of operation per day on average, with the possibility of switching to 2x8 occasionally.
Our services include the studies, supply and assembly of the new single-beam rolling gantry with box installed with a CMU increased to 2×10 T.
It is equipped with 2 winch trolleys with separate elements.
The overall impasto must be optimized in relation to the existing one.

Range: 51 m

Length of beam: 62 m

Lifting height: 10.5 m

Length of the track: 131 m

Splint beam

Site-Prega

Our achievements