TDF - Pylons on guyed pylons

We carried out the studies, supplies and assembly.

STUDIES, SUPPLIES AND ASSEMBLY OF NEW PYLONETS

Project owner: TDF

Replacement of the existing pylon with a new 12 m structure on the guyed pylon (height 200 m), including: studies, manufacturing, dismantling of the existing pylon by helicopter. All studies, including all checks during the provisional assembly phase, were carried out internally by the design office.

Installation of access and arrangement of workstations - equipment for removing the existing pylon - equipment for centering and installing the new pylon - The work on site and in particular the helicopter hoisting operations were carried out in particularly difficult climatic conditions.

Height of each pylon: 12 m